ΥΠΕΡΑΓΟΡΑ ΚΡΕΑΤΩΝ

Λεπτομέρειες έργου

Πελάτης: ΡΙΖΟΣ Π. ΡΙΖΟΣ Ε. Ο.Ε.
Ημερομηνία: 30/11/2016
Περιοχή: ΙΛΙΟΝ

ΑΣ ΔΟΥΛΕΨΟΥΜΕ ΜΑΖΙ

Contact us. We will answer you in 1-2 working days. Or just call us now.

Our company was involved in the feasibility study and supervision of the electromechanical installations concerning the construction of a meat superstore in Ilion.

It is a two-story metal building with a basement, with a total area of approximately 1100 square meters. In the basement of the building, there are parking spaces, changing rooms, as well as refrigeration chambers. On the ground floor, the company’s store will be developed, while offices will be constructed on the upper floor.

The facilities integrated into the building include air conditioning-ventilation units with VRV-VAM systems, refrigeration chambers via a central unit, a Building Management System (BMS) for controlling external lighting through brightness sensors, controlling the temperature of hot water tanks, monitoring the UPS, elevator, generator, and pump stations, controlling the ventilation of the basement parking area, and transferring power with the generator.

All European directives and regulations regarding health and safety have been implemented in the building to ensure smooth operation of the business and maximum quality in service provision.